Installing a smart drying rack properly is essential for safety, performance, and longevity. Follow our step-by-step guide for professional installation results.
**Pre-Installation Preparation:**
– Verify ceiling structure can support the weight (minimum 50kg capacity)
– Measure ceiling height (recommended 2.4-3.0m)
– Ensure power outlet is accessible
– Gather necessary tools: drill, level, wrench, screwdriver
**Installation Steps:**
1. **Mark Mounting Positions**: Use the installation template to mark the four mounting points on the ceiling. Ensure they are level.
2. **Drill Holes**: Drill holes at marked positions and insert expansion bolts.
3. **Mount Brackets**: Secure the mounting brackets to the ceiling using the provided bolts and nuts.
4. **Install Main Unit**: Lift the main unit onto the mounting brackets and secure with safety screws.
5. **Connect Power**: Connect the power cord to a properly grounded outlet. We recommend professional electrical installation.
6. **Attach Drying Rods**: Install the telescopic drying rods and accessory hooks.
7. **Test Operation**: Use the remote control to test lifting, lighting, and other functions.
**Important Safety Notes:**
– Always turn off power during electrical work
– Never exceed the maximum weight capacity
– Inspect mounting regularly
– Keep children away during installation
Need help? Contact Dehuan Electronic customer service for professional installation support.